| Assessment Year | 2005 |
|---|---|
| Principal Product | Analytic Laboratory Equipment/Optics |
| NAICS | 334516: Analytical Laboratory Instrument Manufacturing |
| SIC | 3827: Optical Instruments and Lenses |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
96,000
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | New Jersey |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $35,181 | 1,065,096 |
kWh
|
$0.033 |
| Electricity Demand | $26,125 | 5,033 |
kW-mo/yr
|
$5.19 |
| Natural Gas | $41,075 | 8,987 |
MMBtu
|
$4.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $15,152 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,289 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1321: Replace fossil fuel equipment with electrical equipment | $5,350 | $6,560 | - | - |
$5,350
-
MMBtu
|
|
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,088 | $750 | - | - |
$4,088
-
MMBtu
|
|
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,616 | $2,000 | - |
$2,616
-
kW-mo/yr
|
- | |
| 04 | 2.6218: Turn off equipment when not in use | $2,330 | $4,866 | - | - |
$2,330
-
MMBtu
|
|
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $366 | $140 |
$224
6,789
kWh
|
$142
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $255 | $80 |
$255
7,724
kWh
|
- | - | |
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $147 | $360 |
$86
2,618
kWh
|
$61
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $15,152 | $14,756 |
$565
17,131
kWh
|
$2,819
-
kW-mo/yr
|
$11,768
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $9,289 | $7,696 |
$255
7,724
kWh
|
$2,616
-
kW-mo/yr
|
$6,418
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs