ITAC Assessment: LE0199
ITAC logo
ITAC Assessment: LE0199
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 176
Plant Area 150,000
ft2
Annual Production 18,300,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,353 4,620,424
kWh
Electricity Demand $85,436 11,495
kW-mo/yr
Natural Gas $1,125,410 163,645
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,621 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,592

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1321: Replace fossil fuel equipment with electrical equipment $37,230 $16,000 n/a - - $37,230
-
MMBtu
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $9,780 $15,000 $9,780
123,795
kWh
- -
03 2.2123: Insulate feedwater tank $8,188 $2,220 - - $8,188
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,404 $300 $3,891
49,259
kWh
$513
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $3,019 $1,884 $2,686
34,001
kWh
$333
-
kW-mo/yr
-
TOTAL RECOMMENDED $62,621 $35,404 $16,357
207,055
kWh
$846
-
kW-mo/yr
$45,418
-
MMBtu
TOTAL IMPLEMENTED $12,592 $2,520 $3,891
49,259
kWh
$513
-
kW-mo/yr
$8,188
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs