ITAC Assessment: LE0197
ITAC logo
ITAC Assessment: LE0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ferrous Jobbing Shop
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 328
Plant Area 220,000
ft2
Annual Production 27,000
ton
Production Hrs. Annual 4,080
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,206,716 37,681,776
kWh
Electricity Demand $273,716 35,182
kW-mo/yr
Natural Gas $1,128 73
MMBtu
LPG $207,962 22,759
MMBtu
Fuel Oil #2 $5,197 643
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $455,996 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $398,036

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Primary Product Savings
01 4.446: Automate finishing process $269,280 $300,000 - - - - $269,280
02 2.1321: Replace fossil fuel equipment with electrical equipment $55,434 $60,000 - - - $5,197
-
MMBtu
$50,237
03 2.2414: Use waste heat from hot flue gases to preheat $52,852 $10,000 $52,852
1,845,655
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,606 $2,484 $11,432
357,246
kWh
$8,174
-
kW-mo/yr
- - -
05 2.2426: Use waste heat from flue gases to heat space conditioning air $35,862 $150,000 - - $35,862
-
MMBtu
- -
06 2.2123: Insulate feedwater tank $22,098 $50,000 $22,098
690,575
kWh
- - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $864 $840 $552
17,266
kWh
$312
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $455,996 $573,324 $86,934
2,910,742
kWh
$8,486
-
kW-mo/yr
$35,862
-
MMBtu
$5,197
-
MMBtu
$319,517
TOTAL IMPLEMENTED $398,036 $373,324 $64,836
2,220,167
kWh
$8,486
-
kW-mo/yr
- $5,197
-
MMBtu
$319,517
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings Primary Product Savings