Assessment Year | 2003 |
---|---|
Principal Product | Farm implements |
NAICS | 333111: Farm Machinery and Equipment Manufacturing |
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $5 M to 10M |
# of Employees | 35 |
Plant Area |
140,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,945 | 855,764 |
kWh
|
$0.030 |
Electricity Demand | $50,365 | 4,356 |
kW-mo/yr
|
$11.56 |
Natural Gas | $62,218 | 9,538 |
MMBtu
|
$6.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,775 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,335 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $26,842 | $625 |
$457
19,912
kWh
|
$3,342
-
kW-mo/yr
|
- |
$23,043
-
MMBtu
|
- | - | - | |
02 | 4.131: Modify process to reduce material use/cost | $10,610 | $1,200 | - | - | - | - | - | - | $10,610 | |
03 | 2.3212: Optimize plant power factor | $7,934 | $2,500 | - |
$7,934
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.8112: Combine utility meters | $4,000 | - | - |
$3,880
-
kW-mo/yr
|
$120 | - | - | - | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $3,130 | - |
$1,190
36,000
kWh
|
$1,940
-
kW-mo/yr
|
- | - | - | - | - | |
06 | 3.4156: Use flow control valves on equipment to optimize water use | $3,068 | $384 | - | - | - | - |
$3,068
-
Tgal
|
- | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $2,355 | $280 |
$755
22,880
kWh
|
$1,600
-
kW-mo/yr
|
- | - | - | - | - | |
08 | 2.5123: Reduce fluid flow rates | $2,011 | $1,200 |
$645
19,552
kWh
|
$1,366
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,480 | $9,600 |
$480
14,560
kWh
|
$1,000
-
kW-mo/yr
|
- | - | - | - | - | |
10 | 2.7111: Reduce illumination to minimum necessary levels | $695 | - |
$223
6,760
kWh
|
$472
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.2437: Recover waste heat from equipment | $525 | $1,750 | - | - | - |
$525
-
MMBtu
|
- | - | - | |
12 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $430 | $100 |
$140
4,160
kWh
|
$290
-
kW-mo/yr
|
- | - | - | - | - | |
13 | 3.5142: Treat and reuse equipment cleaning solutions | $250 | $424 | - | - | - | - | - | $250 | - | |
14 | 2.7131: Add area lighting switches | $240 | $200 |
$73
2,208
kWh
|
$167
-
kW-mo/yr
|
- | - | - | - | - | |
15 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $205 | $432 |
$66
1,997
kWh
|
$139
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $63,775 | $18,695 |
$4,029
128,029
kWh
|
$22,130
-
kW-mo/yr
|
$120 |
$23,568
-
MMBtu
|
$3,068
-
Tgal
|
$250 | $10,610 | ||
TOTAL IMPLEMENTED | $47,335 | $3,021 |
$2,831
91,709
kWh
|
$7,783
-
kW-mo/yr
|
- |
$23,043
-
MMBtu
|
$3,068
-
Tgal
|
- | $10,610 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs