ITAC Assessment: LE0192
ITAC logo
ITAC Assessment: LE0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Space Dyed Yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $10
M
to 50
M
# of Employees 77
Plant Area 42,000
ft2
Annual Production 3,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,721 3,602,100
kWh
Electricity Demand $51,656 5,958
kW-mo/yr
Natural Gas $63,195 9,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,165 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,024

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $22,723 $5,000 $569
7,688
kWh
$91
-
kW-mo/yr
$22,063
-
MMBtu
02 2.6218: Turn off equipment when not in use $9,677 - $9,677
130,771
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $9,668 $3,000 $9,668
88,699
kWh
- -
04 2.2136: Install / repair insulation on steam lines $7,128 $1,084 - - $7,128
-
MMBtu
05 2.2511: Insulate bare equipment $2,750 $8,250 $1,874
25,322
kWh
$876
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $2,219 - - - $2,219
-
MMBtu
TOTAL RECOMMENDED $54,165 $17,334 $21,788
252,480
kWh
$967
-
kW-mo/yr
$31,410
-
MMBtu
TOTAL IMPLEMENTED $19,024 $1,084 $9,677
130,771
kWh
- $9,347
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs