ITAC Assessment: LE0186
ITAC logo
ITAC Assessment: LE0186
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Galvanize steel rpoducts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 60,000
ft2
Annual Production 22,500
ton
Production Hrs. Annual 4,160
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,613 1,007,360
kWh
Electricity Demand $26,526 3,510
kW-mo/yr
Natural Gas $300,405 36,562
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,413

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $12,188 $16,273 - - - $12,188
-
MMBtu
02 2.2515: Use optimum thickness insulation $8,974 $7,000 - - - $8,974
-
MMBtu
03 2.3212: Optimize plant power factor $3,293 $3,800 - - $3,293 -
04 2.2515: Use optimum thickness insulation $2,885 $641 - - - $2,885
-
MMBtu
05 2.2113: Repair or replace steam traps $1,428 $600 - - - $1,428
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $773 $200 $532
6,910
kWh
$241
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $405 - $405
5,254
kWh
- - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $340 - $108
1,397
kWh
$232
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $221 - $156
2,029
kWh
$65
-
kW-mo/yr
- -
10 2.7124: Make a practice of turning off lights when not needed $1,232 - $1,232
16,000
kWh
- - -
11 2.7135: Install occupancy sensors $354 - $354
4,594
kWh
- - -
TOTAL RECOMMENDED $32,093 $28,514 $2,787
36,184
kWh
$538
-
kW-mo/yr
$3,293 $25,475
-
MMBtu
TOTAL IMPLEMENTED $4,413 $800 $2,679
34,787
kWh
$306
-
kW-mo/yr
- $1,428
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs