| Assessment Year | 2004 |
|---|---|
| Principal Product | Nylon Resin and Powder |
| NAICS | 325211: Plastics Material and Resin Manufacturing |
| SIC | 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers |
| Sales Range | less than $500 k |
| # of Employees | 132 |
| Plant Area |
172,000
ft2
|
| Annual Production | 20,000,000
lb
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $570,267 | 13,683,092 |
kWh
|
$0.042 |
| Electricity Demand | $253,414 | 26,536 |
kW-mo/yr
|
$9.55 |
| Natural Gas | $751,849 | 144,512 |
MMBtu
|
$5.20 |
| Other Gas | $275,076 | 114,217 |
MMBtu
|
$2.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $129,934 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $49,237 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4131: Size electric motors for peak operating efficiency | $54,350 | $390,000 | n/a |
$41,203
1,004,957
kWh
|
$13,147
-
kW-mo/yr
|
- |
| 02 | 2.2113: Repair or replace steam traps | $49,237 | $10,000 | - | - |
$49,237
-
MMBtu
|
|
| 03 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,090 | $7,000 |
$12,090
294,889
kWh
|
- | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $5,113 | $2,497 | - | - |
$5,113
-
MMBtu
|
|
| 05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,591 | $750 | - | - |
$3,591
-
MMBtu
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $3,467 | $500 |
$2,640
64,389
kWh
|
$827
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,086 | $21,041 |
$1,083
19,346
kWh
|
$1,003
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $129,934 | $431,788 |
$57,016
1,383,581
kWh
|
$14,977
-
kW-mo/yr
|
$57,941
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $49,237 | $10,000 | - | - |
$49,237
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs