ITAC Assessment: LE0177
ITAC logo
ITAC Assessment: LE0177
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Diamond and Diamond-Like Industrial Coating
NAICS 339910: Jewelry and Silverware Manufacturing
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 26,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,185 3,891,700
kWh
Electricity Demand $51,988 7,491
kW-mo/yr
Natural Gas $20,632 1,792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,637 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $4,980 $1,700 - - $4,980
-
MMBtu
02 2.1321: Replace fossil fuel equipment with electrical equipment $2,947 $5,000 $(-738.0)
(-12,308)
kWh
$(-919.0)
-
kW-mo/yr
$4,604
-
MMBtu
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,194 - $1,750
29,160
kWh
$444
-
kW-mo/yr
-
04 2.2515: Use optimum thickness insulation $516 $585 $516
8,593
kWh
- -
TOTAL RECOMMENDED $10,637 $7,285 $1,528
25,445
kWh
$(-475.0)
-
kW-mo/yr
$9,584
-
MMBtu
TOTAL IMPLEMENTED $2,710 $585 $2,266
37,753
kWh
$444
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs