ITAC Assessment: LE0175
ITAC logo
ITAC Assessment: LE0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aluminum Castings
NAICS 331524: Aluminum Foundries (except Die-Casting)
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area 100,000
ft2
Annual Production 2,300,000
lb
Production Hrs. Annual 2,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $245,027 4,522,893
kWh
Electricity Demand $106,442 15,690
kW-mo/yr
Natural Gas $54,397 10,821
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,828

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,828 $400 $5,614
103,588
kWh
$4,214
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $642 - $642
11,847
kWh
- -
03 2.7441: Replace broken windows and/or window sash $1,376 $2,118 - - $1,376
-
MMBtu
04 2.7135: Install occupancy sensors $390 $600 $390
7,188
kWh
- -
TOTAL RECOMMENDED $12,236 $3,118 $6,646
122,623
kWh
$4,214
-
kW-mo/yr
$1,376
-
MMBtu
TOTAL IMPLEMENTED $9,828 $400 $5,614
103,588
kWh
$4,214
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs