| Assessment Year | 2005 |
|---|---|
| Principal Product | Bricks |
| NAICS | 327120: Clay Building Material and Refractories Manufacturing |
| SIC | 3251: Brick and Structural Clay Tile |
| Sales Range | $1 M to 5M |
| # of Employees | 68 |
| Plant Area |
118,000
ft2
|
| Annual Production | 18,000,000
pieces
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $65,938 | 1,635,091 |
kWh
|
$0.040 |
| Electricity Demand | $66,959 | 6,313 |
kW-mo/yr
|
$10.61 |
| Electricity Fees | $2,329 | - |
|
- |
| Natural Gas | $619,274 | 85,079 |
MMBtu
|
$7.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $51,476 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2515: Use optimum thickness insulation | $46,503 | $3,038 | - | - | - |
$46,503
-
MMBtu
|
- | |
| 02 | 2.7231: Use radiant heater for spot heating | $1,726 | $3,000 | - | - | - |
$1,726
-
MMBtu
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,569 | $3,249 |
$1,030
29,397
kWh
|
$516
-
kW-mo/yr
|
$23 | - | - | |
| 04 | 3.4154: Eliminate leaks in water lines and valves | $888 | $250 | - | - | - | - |
$888
-
Tgal
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $790 | $1,539 |
$251
7,173
kWh
|
$527
-
kW-mo/yr
|
$12 | - | - | |
| TOTAL RECOMMENDED | $51,476 | $11,076 |
$1,281
36,570
kWh
|
$1,043
-
kW-mo/yr
|
$35 |
$48,229
-
MMBtu
|
$888
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs