ITAC Assessment: LE0138
ITAC logo
ITAC Assessment: LE0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Stainless Steel Tanks and Chemical Mixers
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 44
Plant Area 54,500
ft2
Annual Production 50
pieces
Production Hrs. Annual 4,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,425 724,560
kWh
Electricity Demand $30,359 3,282
kW-mo/yr
Natural Gas $40,818 4,160
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,692

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $311 $500 $209
2,901
kWh
$102
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $27,336 $6,800 - - $27,336
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $897 $147 $647
9,000
kWh
$250
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $670 - $451
6,266
kWh
$219
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $563 - $563
7,833
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,471 $100 $4,471
62,179
kWh
- -
07 2.2515: Use optimum thickness insulation $1,551 $60 - - $1,551
-
MMBtu
TOTAL RECOMMENDED $35,799 $7,607 $6,341
88,179
kWh
$571
-
kW-mo/yr
$28,887
-
MMBtu
TOTAL IMPLEMENTED $6,692 $160 $4,922
68,445
kWh
$219
-
kW-mo/yr
$1,551
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs