ITAC Assessment: LE0137
ITAC logo
ITAC Assessment: LE0137
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Power Transmission Equipment
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 415,454
ft2
Annual Production 33,000
ton
Production Hrs. Annual 6,500
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $998,560 27,347,634
kWh
Electricity Demand $366,883 36,466
kW-mo/yr
Natural Gas $490,000 61,936
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,585 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $54,428 $30,000 - - $54,428
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $20,604 $31,000 - - $20,604
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $43,767 $25,000 - $43,767
-
kW-mo/yr
-
04 2.2437: Recover waste heat from equipment $14,099 $11,750 - - $14,099
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $6,615 $3,000 $2,569
101,539
kWh
$4,046
-
kW-mo/yr
-
06 2.4238: Do not use compressed air for personal cooling $370 $700 $112
4,421
kWh
$258
-
kW-mo/yr
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,702 - $1,049
41,463
kWh
$1,653
-
kW-mo/yr
-
TOTAL RECOMMENDED $142,585 $101,450 $3,730
147,423
kWh
$49,724
-
kW-mo/yr
$89,131
-
MMBtu
TOTAL IMPLEMENTED $20,714 $14,750 $2,569
101,539
kWh
$4,046
-
kW-mo/yr
$14,099
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs