ITAC Assessment: LE0136
ITAC logo
ITAC Assessment: LE0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated Cardboard Sheets
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 116,640
ft2
Annual Production 0
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $233,553 2,719,400
kWh
Electricity Demand $87,607 6,063
kW-mo/yr
Natural Gas $51,575 11,565
MMBtu
LPG $17,658 1,528
MMBtu
Fuel Oil #6 $158,912 32,768
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #6 Savings Water Consumption Savings Primary Product Savings
01 2.4221: Install compressor air intakes in coolest locations $2,384 $1,200 $1,465
29,950
kWh
$919
-
kW-mo/yr
- - - -
02 2.2113: Repair or replace steam traps $34,475 $17,000 - - $34,475
-
MMBtu
- - -
03 3.4115: Recover and reuse cooling water $1,527 $2,000 - - - - $1,527
-
Tgal
-
04 4.122: Develop standard procedures to improve internal yields $34,222 $60,000 - - - - - $34,222
05 2.1233: Analyze flue gas for proper air/fuel ratio $5,262 $1,000 - - $1,289
-
MMBtu
$3,973
-
MMBtu
- -
TOTAL RECOMMENDED $77,870 $81,200 $1,465
29,950
kWh
$919
-
kW-mo/yr
$35,764
-
MMBtu
$3,973
-
MMBtu
$1,527
-
Tgal
$34,222
TOTAL IMPLEMENTED - - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs