ITAC Assessment: LE0135
ITAC logo
ITAC Assessment: LE0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Solar Cells
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $50
M
to 100
M
# of Employees 440
Plant Area 130,000
ft2
Annual Production 9,000,000
pieces
Production Hrs. Annual 7,072
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,317 11,066,350
kWh
Electricity Demand $242,015 21,887
kW-mo/yr
Natural Gas $18,816 2,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,673 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,358

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3191: Use demand controller or load shedder $10,955 $2,500 - $10,955
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $3,721 $2,500 $2,136
60,867
kWh
$1,585
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,451 - $2,451
69,816
kWh
- -
04 2.2514: Cover open tanks $4,639 $12,000 - - $4,639
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,792 - $1,654
47,132
kWh
$1,138
-
kW-mo/yr
-
06 2.4312: Improve lubrication practices $1,066 $200 $701
19,966
kWh
$365
-
kW-mo/yr
-
07 2.3212: Optimize plant power factor $62,395 $12,000 - $62,395
-
kW-mo/yr
-
08 2.2611: Moderate cooling tower outlet temperature $1,654 $630 $1,654
47,125
kWh
- -
TOTAL RECOMMENDED $89,673 $29,830 $8,596
244,906
kWh
$76,438
-
kW-mo/yr
$4,639
-
MMBtu
TOTAL IMPLEMENTED $70,358 $12,830 $6,460
184,039
kWh
$63,898
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs