ITAC Assessment: LE0133
ITAC logo
ITAC Assessment: LE0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Cordage, Storage and Organization Hardware
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $50
M
to 100
M
# of Employees 198
Plant Area 269,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,777 3,104,938
kWh
Electricity Demand $38,962 6,874
kW-mo/yr
Natural Gas $100,281 8,615
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $85,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,739

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $78,742 - - - $78,742 -
02 2.1331: Burn a less expensive grade of fuel $1,298 $6,000 - - - $1,298
03 2.7111: Reduce illumination to minimum necessary levels $983 - $635
12,646
kWh
$348
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $349 $750 $349
6,956
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $851 $750 $613
12,219
kWh
$238
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,163 - $2,453
48,859
kWh
$710
-
kW-mo/yr
- -
TOTAL RECOMMENDED $85,386 $7,500 $4,050
80,680
kWh
$1,296
-
kW-mo/yr
$78,742 $1,298
TOTAL IMPLEMENTED $83,739 $750 $3,701
73,724
kWh
$1,296
-
kW-mo/yr
$78,742 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs