ITAC Assessment: GT0675
ITAC logo
ITAC Assessment: GT0675
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Rebuilt Hydraulic Cylanders
NAICS
n/a
SIC 3593: Fluid Power Cylinders and Actuators
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 11,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 2,625
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,040 102,872
kWh
Electricity Fees $699 -
Natural Gas $2,840 326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,394 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.8114: Change rate schedules or other changes in utility service $320 - - - - - $320 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $124 $975 $117
1,465
kWh
$7 - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $472 $1,602 $433
5,569
kWh
$39 - - - -
04 2.8114: Change rate schedules or other changes in utility service $150 - - - - - $150 -
05 2.7224: Reduce space conditioning during non-working hours $552 $200 $140
8,499
kWh
$8 $404
-
MMBtu
- - -
06 3.5311: Recover and reuse waste material $7,776 $12,000 - - - $1,440
-
gal
- $6,336
TOTAL RECOMMENDED $9,394 $14,777 $690
15,533
kWh
$54 $404
-
MMBtu
$1,440
-
gal
$470 $6,336
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs