ITAC Assessment: UF0029
ITAC logo
ITAC Assessment: UF0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SUNGLASSES,DISPLAY SIGNS
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area
n/a
Annual Production 11,000
pieces
Production Hrs. Annual 2,350
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,064 367,526
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,560 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $581 $1,390 $581
5,569
kWh
02 2.7144: Install spectral reflectors / delamp $7,343 $18,945 $7,343
72,685
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,083 $3,698 $1,083
10,844
kWh
04 2.7111: Reduce illumination to minimum necessary levels $1,899 - $1,899
18,757
kWh
05 2.4322: Use or replace with energy efficient substitutes $570 $1,980 $570
5,569
kWh
06 2.4133: Use most efficient type of electric motors $84 $1,027 $84
879
kWh
TOTAL RECOMMENDED $11,560 $27,040 $11,560
114,303
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs