ITAC Assessment: LE0128
ITAC logo
ITAC Assessment: LE0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Packages of dispensing systems
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 99
Plant Area 20,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,080
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,889 561,652
kWh
Electricity Demand $16,035 2,059
kW-mo/yr
Fuel Oil #2 $9,574 1,354
MMBtu
Other Gas $1,273 56
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,993 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings Fuel Oil #2 Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,406 $2,500 - $2,406
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $2,470 - $1,947
22,848
kWh
$523
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $530 $1,280 $336
3,946
kWh
$194
-
kW-mo/yr
- -
04 2.2136: Install / repair insulation on steam lines $793 $830 - - - $793
-
MMBtu
05 3.5315: Lease / purchase baler; sell cardboard to recycler $4,794 $6,480 - - $4,794
-
MMBtu
-
TOTAL RECOMMENDED $10,993 $11,090 $2,283
26,794
kWh
$3,123
-
kW-mo/yr
$4,794
-
MMBtu
$793
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs