ITAC Assessment: LE0123
ITAC logo
ITAC Assessment: LE0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Television Phosphor
NAICS
n/a
SIC 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 85,000
ft2
Annual Production 1,262,000
ton
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $822,977 9,510,222
kWh
Electricity Demand $156,499 17,307
kW-mo/yr
Natural Gas $102,616 15,146
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,772 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,614

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $23,468 $2,500 - $23,468
-
kW-mo/yr
- -
02 2.2123: Insulate feedwater tank $14,924 $380 - - $14,924
-
MMBtu
-
03 2.2511: Insulate bare equipment $57,598 $6,000 $57,598
821,660
kWh
- - -
04 3.5316: Contract a wood pallet recycling company $13,548 - - - - $13,548
-
lb
05 2.4221: Install compressor air intakes in coolest locations $2,354 $1,280 $1,632
23,275
kWh
$722
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,880 - $3,109
44,366
kWh
$771
-
kW-mo/yr
- -
TOTAL RECOMMENDED $115,772 $10,160 $62,339
889,301
kWh
$24,961
-
kW-mo/yr
$14,924
-
MMBtu
$13,548
-
lb
TOTAL IMPLEMENTED $94,614 $8,500 $57,598
821,660
kWh
$23,468
-
kW-mo/yr
- $13,548
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs