Assessment Year | 2001 |
---|---|
Principal Product | Television Phosphor |
NAICS |
n/a
|
SIC | 2819: Industrial Inorganic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 107 |
Plant Area |
85,000
ft2
|
Annual Production | 1,262,000
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | New Jersey |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $822,977 | 9,510,222 |
kWh
|
$0.087 |
Electricity Demand | $156,499 | 17,307 |
kW-mo/yr
|
$9.04 |
Natural Gas | $102,616 | 15,146 |
MMBtu
|
$6.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $115,772 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,614 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $23,468 | $2,500 | - |
$23,468
-
kW-mo/yr
|
- | - | |
02 | 2.2123: Insulate feedwater tank | $14,924 | $380 | - | - |
$14,924
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $57,598 | $6,000 |
$57,598
821,660
kWh
|
- | - | - | |
04 | 3.5316: Contract a wood pallet recycling company | $13,548 | - | - | - | - |
$13,548
-
lb
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $2,354 | $1,280 |
$1,632
23,275
kWh
|
$722
-
kW-mo/yr
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,880 | - |
$3,109
44,366
kWh
|
$771
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $115,772 | $10,160 |
$62,339
889,301
kWh
|
$24,961
-
kW-mo/yr
|
$14,924
-
MMBtu
|
$13,548
-
lb
|
||
TOTAL IMPLEMENTED | $94,614 | $8,500 |
$57,598
821,660
kWh
|
$23,468
-
kW-mo/yr
|
- |
$13,548
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs