ITAC Assessment: LE0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Carbon,stainless steel, and nickel base casting
NAICS
n/a
SIC 3325: Steel Foundries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 26,000
ft2
Annual Production 480
ton
Production Hrs. Annual 2,040
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,985 1,286,880
kWh
Electricity Demand $32,761 3,790
kW-mo/yr
Natural Gas $4,905 523
MMBtu
Other Gas $2,629 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
01 2.2623: Minimize condenser cooling water temperature $2,453 $245 - - $2,453
-
MMBtu
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $674 - $343
7,612
kWh
$331
-
kW-mo/yr
- -
03 2.1331: Burn a less expensive grade of fuel $301 - - - - $301
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,872 $850 - - $2,872
-
MMBtu
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $4,880 $1,200 - - $4,880
-
MMBtu
-
TOTAL RECOMMENDED $11,180 $2,295 $343
7,612
kWh
$331
-
kW-mo/yr
$10,205
-
MMBtu
$301
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs