ITAC Assessment: KU0548
ITAC logo
ITAC Assessment: KU0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product electrical metering equipment
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 108,800
ft2
Annual Production 432,000
units
Production Hrs. Annual 4,500
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $123,116 2,810,906
kWh
Electricity Demand $35,839 8,299
kW-mo/yr
Electricity Fees $23,433 -
Natural Gas $81,214 14,516
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,135 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
01 2.8113: Purchase gas directly from a contract gas supplier $13,917 - n/a - - - - - $13,917 -
02 2.4226: Use / purchase optimum sized compressor $6,154 $11,500 n/a $4,211
107,562
kWh
$1,943
-
kW-mo/yr
- - - - -
03 2.2437: Recover waste heat from equipment $3,963 $1,505 n/a - - $3,963
-
MMBtu
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,604 $40 n/a $1,496
38,101
kWh
$1,108
-
kW-mo/yr
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,422 $1,050 n/a $1,284
32,532
kWh
$1,138
-
kW-mo/yr
- - - - -
06 3.4151: Minimize water usage $4,075 $4,075 n/a - - $2,845
-
MMBtu
$1,698
-
Tgal
$(-2,400.0) - $1,932
-
Tgal
TOTAL RECOMMENDED $33,135 $18,170 $6,991
178,195
kWh
$4,189
-
kW-mo/yr
$6,808
-
MMBtu
$1,698
-
Tgal
$(-2,400.0) $13,917 $1,932
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs