ITAC Assessment: KU0540
ITAC logo
ITAC Assessment: KU0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product comercial turf equipment
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 95,707
ft2
Annual Production 2,320
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,846 2,319,461
kWh
Electricity Demand $88,265 7,740
kW-mo/yr
Natural Gas $48,149 12,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $3,370 $10,180 $3,370
94,373
kWh
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,240 $450 $1,390
38,687
kWh
$850
-
kW-mo/yr
- - - - -
03 2.3212: Optimize plant power factor $2,000 $2,400 - $2,000
-
kW-mo/yr
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $680 $70 $420
11,723
kWh
$260
-
kW-mo/yr
- - - - -
05 3.4111: Use closed cycle process to minimize waste water production $20,800 $9,400 $(-790.0)
(-21,981)
kWh
$(-490.0)
-
kW-mo/yr
$22,080
-
Tgal
- - - -
06 3.8142: Distill contaminated solvents for reuse $5,920 $240 - $(-570.0)
-
kW-mo/yr
- $2,060
-
gal
$(-3,630.0) - $8,060
07 4.446: Automate finishing process $33,420 $92,600 $(-1,160.0)
(-32,532)
kWh
$(-2,020.0)
-
kW-mo/yr
- - $36,600 - -
08 4.611: Begin a practice of predictive / preventative maintenance $2,800 $6,000 - - - - - $2,800 -
TOTAL RECOMMENDED $71,230 $121,340 $3,230
90,270
kWh
$30
-
kW-mo/yr
$22,080
-
Tgal
$2,060
-
gal
$32,970 $2,800 $8,060
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs