ITAC Assessment: KU0532
ITAC logo
ITAC Assessment: KU0532
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product pressure vessels
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 150,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 4,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,016 2,193,435
kWh
Electricity Demand $41,503 8,401
kW-mo/yr
Natural Gas $166,548 49,285
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $51,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,410 $17,000 - - $11,410
-
MMBtu
- - - - -
02 2.4226: Use / purchase optimum sized compressor $8,040 $20,000 $2,390
54,220
kWh
$5,650
-
kW-mo/yr
- - - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,060 $12,170 $7,170
162,075
kWh
$2,120
-
kW-mo/yr
$(-2,230.0)
-
MMBtu
- - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $700 $450 $460
10,258
kWh
$240
-
kW-mo/yr
- - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $260 $360 $60
1,465
kWh
$40
-
kW-mo/yr
- - - - $160 -
06 3.4111: Use closed cycle process to minimize waste water production $9,410 $14,000 $(-1,770.0)
(-39,859)
kWh
$(-1,510.0)
-
kW-mo/yr
- $12,690
-
Tgal
- - - -
07 3.1191: Change procedures / equipment / operating conditions $12,150 $11,640 - - - - - $33,750
-
lb
- $(-21,600.0)
08 3.8143: Recycle cleaning solvent and reuse $2,620 $800 - - - - $210
-
gal
- - $2,410
TOTAL RECOMMENDED $51,650 $76,420 $8,310
188,159
kWh
$6,540
-
kW-mo/yr
$9,180
-
MMBtu
$12,690
-
Tgal
$210
-
gal
$33,750
-
lb
$160 $(-19,190.0)
TOTAL IMPLEMENTED $18,680 $33,780 $10,080
228,018
kWh
$8,050
-
kW-mo/yr
$(-2,230.0)
-
MMBtu
- $210
-
gal
- $160 $2,410
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs