Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Oil field equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 23,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,930 191,200
kWh
Electricity Fees $515 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,052 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $843

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,006 $225 $967
14,246
kWh
$39 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $843 $520 $811
11,947
kWh
$32 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $520 $270 $203
2,996
kWh
$8 $309
04 2.4231: Reduce the pressure of compressed air to the minimum required $326 $20 $313
4,617
kWh
$13 -
05 2.7135: Install occupancy sensors $319 $364 $307
4,525
kWh
$12 -
06 2.7134: Use photocell controls $38 $41 $37
544
kWh
$1 -
TOTAL RECOMMENDED $3,052 $1,440 $2,638
38,875
kWh
$105 $309
TOTAL IMPLEMENTED $843 $520 $811
11,947
kWh
$32 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs