ITAC Assessment: MU0054
ITAC logo
ITAC Assessment: MU0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Brass/Copper fittings
NAICS 332721: Precision Turned Product Manufacturing
SIC 3451: Screw Machine Products
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 190,000
ft2
Annual Production 6,000,000
units
Production Hrs. Annual 7,488
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,543 10,349,893
kWh
Electricity Demand $123,287 25,632
kW-mo/yr
Electricity Fees $30,758 -
Natural Gas $48,987 8,220
MMBtu
Other Gas $465 1
MMBtu
TOTAL YEARLY COSTS $797,040
RECOMMENDED SAVINGS* $25,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2211: Use optimum temperature $6,955 - $5,577
92,949
kWh
$717
-
kW-mo/yr
$662
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,402 $28,100 $7,445
124,085
kWh
$957
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $6,874 - $6,091
101,524
kWh
$783
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,876 $1,801 $1,662
27,705
kWh
$214
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,296 - $1,148
19,139
kWh
$148
-
kW-mo/yr
-
06 2.7492: Use proper thickness of insulation on building envelope $118 $272 $18
296
kWh
$2
-
kW-mo/yr
$98
-
MMBtu
07 2.7496: Install partitions to reduce size of conditioned space $349 - - - $349
-
MMBtu
TOTAL RECOMMENDED $25,870 $30,173 $21,942
365,697
kWh
$2,819
-
kW-mo/yr
$1,109
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs