ITAC Assessment: OD0018
ITAC logo
ITAC Assessment: OD0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Peanut Harvesting, bark processing, irrigation equipment
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 55,000
ft2
Annual Production 340
pieces
Production Hrs. Annual 6,600
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,405 1,284,877
kWh
Natural Gas $15,027 2,243
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,387 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,354

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,033 $28,714 $20,033
272,860
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,977 $1,000 $2,977
40,445
kWh
03 2.4133: Use most efficient type of electric motors $821 $1,002 $821
11,137
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $556 $741 $556
7,620
kWh
TOTAL RECOMMENDED $24,387 $31,457 $24,387
332,062
kWh
TOTAL IMPLEMENTED $4,354 $2,743 $4,354
59,202
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs