| Assessment Year | 1999 |
|---|---|
| Principal Product | PVC pipe |
| NAICS |
n/a
|
| SIC | 3084: Plastics Pipe |
| Sales Range | $10 M to 50M |
| # of Employees | 68 |
| Plant Area |
50,450
ft2
|
| Annual Production | 49,100,000
lb
|
| Production Hrs. Annual | 8,640
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $227,235 | 8,656,507 |
kWh
|
$0.026 |
| Electricity Demand | $190,693 | 13,306 |
kW-mo/yr
|
$14.33 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $99,690 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $90,380 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2221: Use immersion heating in tanks, melting pots, etc | $8,170 | $11,490 |
$5,200
196,659
kWh
|
$2,970
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,440 | $860 |
$1,550
58,617
kWh
|
$890
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,840 | $350 |
$1,170
44,549
kWh
|
$670
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $1,140 | $680 |
$640
24,326
kWh
|
$500
-
kW-mo/yr
|
- | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,490 | $5,000 | - | - | - |
$1,490
-
lb
|
- | |
| 06 | 3.4154: Eliminate leaks in water lines and valves | $270 | $160 | - | - |
$270
-
Tgal
|
- | - | |
| 07 | 4.131: Modify process to reduce material use/cost | $84,340 | $24,800 | - | - | - |
$3,340
-
lb
|
$81,000 | |
| TOTAL RECOMMENDED | $99,690 | $43,340 |
$8,560
324,151
kWh
|
$5,030
-
kW-mo/yr
|
$270
-
Tgal
|
$4,830
-
lb
|
$81,000 | ||
| TOTAL IMPLEMENTED | $90,380 | $31,170 |
$2,720
103,166
kWh
|
$1,560
-
kW-mo/yr
|
$270
-
Tgal
|
$4,830
-
lb
|
$81,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs