Assessment Year | 1999 |
---|---|
Principal Product | china plumbing fixtures |
NAICS |
n/a
|
SIC | 3261: Vitreous China Plumbing Fixtures and China and Earthenware Fittings and Bathroom Accessories |
Sales Range | $10 M to 50M |
# of Employees | 132 |
Plant Area |
205,000
ft2
|
Annual Production | 287,000
pieces
|
Production Hrs. Annual | 7,920
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,134 | 3,307,444 |
kWh
|
$0.040 |
Electricity Demand | $28,492 | 7,824 |
kW-mo/yr
|
$3.64 |
Natural Gas | $245,119 | 99,505 |
MMBtu
|
$2.46 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,490 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2422: Use waste heat from hot flue gases to generate steam | $15,510 | $29,690 | - | - |
$15,510
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,240 | $800 |
$930
30,774
kWh
|
$310
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,010 | $770 |
$640
21,395
kWh
|
$370
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $230 | $350 |
$50
1,758
kWh
|
$10
-
kW-mo/yr
|
- | - | $170 | - | |
05 | 3.4155: Meter waste water | $2,620 | $1,900 | - | - | - |
$2,620
-
Tgal
|
- | - | |
06 | 3.4111: Use closed cycle process to minimize waste water production | $2,230 | $1,050 | - | - | - |
$2,230
-
Tgal
|
- | - | |
07 | 4.131: Modify process to reduce material use/cost | $3,650 | $10,000 | - | - | - | - | - | $3,650 | |
TOTAL RECOMMENDED | $26,490 | $44,560 |
$1,620
53,927
kWh
|
$690
-
kW-mo/yr
|
$15,510
-
MMBtu
|
$4,850
-
Tgal
|
$170 | $3,650 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs