Assessment Year | 1998 |
---|---|
Principal Product | Plastic bottles |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
73,250
ft2
|
Annual Production | 24,000,000
lb
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $416,583 | 12,311,841 |
kWh
|
$0.034 |
Electricity Demand | $114,954 | 22,893 |
kW-mo/yr
|
$5.02 |
Natural Gas | $17,045 | 2,868 |
MMBtu
|
$5.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $287,190 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $216,090 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $7,850 | $5,030 |
$6,220
208,089
kWh
|
$1,630
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7241: Install outside air damper / economizer on hvac unit | $6,900 | $7,180 |
$6,900
230,657
kWh
|
- | - | - | - | - | |
03 | 2.7135: Install occupancy sensors | $470 | $350 |
$470
15,533
kWh
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $440 | $100 |
$360
12,309
kWh
|
$80
-
kW-mo/yr
|
- | - | - | - | |
05 | 3.8132: Use less toxic and volatile solvent substitutes | $530 | $1,500 |
$(-80.0)
(-2,638)
kWh
|
$(-30.0)
-
kW-mo/yr
|
$1,280
-
gal
|
- | $(-640.0) | - | |
06 | 4.111: Add equipment/ operators to reduce production bottleneck | $200,430 | $152,790 |
$28,770
962,192
kWh
|
$6,300
-
kW-mo/yr
|
- | - | - | $165,360 | |
07 | 4.441: Install automatic packing equipment | $70,570 | $158,000 | - | - | - | $70,570 | - | - | |
TOTAL RECOMMENDED | $287,190 | $324,950 |
$42,640
1,426,142
kWh
|
$7,980
-
kW-mo/yr
|
$1,280
-
gal
|
$70,570 | $(-640.0) | $165,360 | ||
TOTAL IMPLEMENTED | $216,090 | $165,450 |
$42,720
1,428,780
kWh
|
$8,010
-
kW-mo/yr
|
- | - | - | $165,360 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs