Assessment Year | 1998 |
---|---|
Principal Product | food spice |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 189 |
Plant Area |
225,314
ft2
|
Annual Production | 13,000,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $115,719 | 2,053,927 |
kWh
|
$0.056 |
Electricity Demand | $27,658 | 4,426 |
kW-mo/yr
|
$6.25 |
Natural Gas | $46,411 | 8,178 |
MMBtu
|
$5.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $299,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $109,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,140 | $9,600 |
$2,960
52,755
kWh
|
$840
-
kW-mo/yr
|
$340 | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,350 | $20 |
$1,010
17,878
kWh
|
$340
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $970 | $400 |
$730
12,896
kWh
|
$240
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $720 | $340 |
$540
9,672
kWh
|
$180
-
kW-mo/yr
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $510 | $260 |
$410
7,327
kWh
|
$100
-
kW-mo/yr
|
- | - | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $800 | - | - | - | - | - | $800 | |
07 | 4.211: Consider use / purchase of bulk materials where possible | $190,000 | $333,750 | - | - | - | - | $190,000 | |
08 | 4.131: Modify process to reduce material use/cost | $75,000 | $193,000 | - | - | $75,000 | - | - | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $25,940 | $2,560 | - | - | $25,000 | $40 | $900 | |
TOTAL RECOMMENDED | $299,430 | $539,930 |
$5,650
100,528
kWh
|
$1,700
-
kW-mo/yr
|
$100,340 | $40 | $191,700 | ||
TOTAL IMPLEMENTED | $109,430 | $206,180 |
$5,650
100,528
kWh
|
$1,700
-
kW-mo/yr
|
$100,340 | $40 | $1,700 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs