ITAC Assessment: KU0491
ITAC logo
ITAC Assessment: KU0491
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product hydraulic/pneumatic jacks
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 146,400
ft2
Annual Production 16,655
pieces
Production Hrs. Annual 4,100
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,344 1,912,954
kWh
Electricity Demand $23,716 6,300
kW-mo/yr
Natural Gas $59,292 10,883
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $97,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,610 $1,000 - - $1,610
-
MMBtu
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $760 $2,630 $600
14,068
kWh
$160
-
kW-mo/yr
- - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $640 $780 $190
4,396
kWh
$20
-
kW-mo/yr
- - $430 - -
04 2.7132: Install timers on light switches in little used areas $590 $800 $590
13,775
kWh
- - - - - -
05 2.2136: Install / repair insulation on steam lines $420 $690 - - $420
-
MMBtu
- - - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $370 $1,140 $660
15,533
kWh
$60
-
kW-mo/yr
$(-350.0)
-
MMBtu
- - - -
07 2.4221: Install compressor air intakes in coolest locations $240 $210 $190
4,396
kWh
$50
-
kW-mo/yr
- - - - -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $2,650 $7,000 - - - $2,890
-
lb
$(-240.0) - -
09 3.5316: Contract a wood pallet recycling company $1,560 - - - - $1,560
-
lb
- - -
10 4.652: Replace existing equipment with more suitable substitutes $54,580 $150,500 $(-430.0)
(-10,258)
kWh
$(-110.0)
-
kW-mo/yr
- - $38,500 $16,620 -
11 4.652: Replace existing equipment with more suitable substitutes $34,550 $60,000 - - - - $24,000 - $10,550
TOTAL RECOMMENDED $97,970 $224,750 $1,800
41,910
kWh
$180
-
kW-mo/yr
$1,680
-
MMBtu
$4,450
-
lb
$62,690 $16,620 $10,550
TOTAL IMPLEMENTED $39,360 $64,620 $980
22,860
kWh
$230
-
kW-mo/yr
$1,610
-
MMBtu
$1,560
-
lb
$24,430 - $10,550
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs