ITAC Assessment: AR0053
ITAC logo
ITAC Assessment: AR0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product High Speed Drill Bits
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $5
M
to 10
M
# of Employees 88
Plant Area 82,000
ft2
Annual Production 6,500,000
pieces
Production Hrs. Annual 6,017
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $353,811 5,179,660
kWh
Natural Gas $14,112 3,270
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,407 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,407

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,048 $1,548 $9,048
137,456
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,527 $200 $4,527
77,081
kWh
03 2.4133: Use most efficient type of electric motors $8,253 $10,970 $8,253
126,905
kWh
04 2.7111: Reduce illumination to minimum necessary levels $916 $90 $916
15,533
kWh
05 2.4221: Install compressor air intakes in coolest locations $115 $100 $115
5,569
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $16,548 - $16,548
-
kWh
TOTAL RECOMMENDED $39,407 $12,908 $39,407
362,544
kWh
TOTAL IMPLEMENTED $39,407 $12,908 $39,407
362,544
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs