| Assessment Year | 1995 |
|---|---|
| Principal Product | High Speed Drill Bits |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $5 M to 10M |
| # of Employees | 88 |
| Plant Area |
82,000
ft2
|
| Annual Production | 6,500,000
pieces
|
| Production Hrs. Annual | 6,017
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $353,811 | 5,179,660 |
kWh
|
$0.068 |
| Natural Gas | $14,112 | 3,270 |
MMBtu
|
$4.32 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,407 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $39,407 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,048 | $1,548 |
$9,048
137,456
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,527 | $200 |
$4,527
77,081
kWh
|
|
| 03 | 2.4133: Use most efficient type of electric motors | $8,253 | $10,970 |
$8,253
126,905
kWh
|
|
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $916 | $90 |
$916
15,533
kWh
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $115 | $100 |
$115
5,569
kWh
|
|
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $16,548 | - |
$16,548
-
kWh
|
|
| TOTAL RECOMMENDED | $39,407 | $12,908 |
$39,407
362,544
kWh
|
||
| TOTAL IMPLEMENTED | $39,407 | $12,908 |
$39,407
362,544
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs