ITAC Assessment: KU0490
ITAC logo
ITAC Assessment: KU0490
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product fabricated structural & misc. steel products
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 85,000
ft2
Annual Production 4,200
ton
Production Hrs. Annual 2,925
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,848 431,419
kWh
Electricity Demand $10,626 2,419
kW-mo/yr
Natural Gas $14,697 2,413
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,150 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,990 $650 $2,370
34,291
kWh
$620
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $860 $2,000 $670
9,672
kWh
$190
-
kW-mo/yr
-
03 2.4314: Use synthetic lubricant $710 $1,510 $420
6,155
kWh
$110
-
kW-mo/yr
$180
04 2.4221: Install compressor air intakes in coolest locations $620 $340 $490
7,034
kWh
$130
-
kW-mo/yr
-
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,970 $3,840 - - $14,970
TOTAL RECOMMENDED $20,150 $8,340 $3,950
57,152
kWh
$1,050
-
kW-mo/yr
$15,150
TOTAL IMPLEMENTED $5,180 $4,500 $3,950
57,152
kWh
$1,050
-
kW-mo/yr
$180
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs