Assessment Year | 1997 |
---|---|
Principal Product | fabricated structural & misc. steel products |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
85,000
ft2
|
Annual Production | 4,200
ton
|
Production Hrs. Annual | 2,925
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,848 | 431,419 |
kWh
|
$0.069 |
Electricity Demand | $10,626 | 2,419 |
kW-mo/yr
|
$4.39 |
Natural Gas | $14,697 | 2,413 |
MMBtu
|
$6.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,180 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,990 | $650 |
$2,370
34,291
kWh
|
$620
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $860 | $2,000 |
$670
9,672
kWh
|
$190
-
kW-mo/yr
|
- | |
03 | 2.4314: Use synthetic lubricant | $710 | $1,510 |
$420
6,155
kWh
|
$110
-
kW-mo/yr
|
$180 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $620 | $340 |
$490
7,034
kWh
|
$130
-
kW-mo/yr
|
- | |
05 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $14,970 | $3,840 | - | - | $14,970 | |
TOTAL RECOMMENDED | $20,150 | $8,340 |
$3,950
57,152
kWh
|
$1,050
-
kW-mo/yr
|
$15,150 | ||
TOTAL IMPLEMENTED | $5,180 | $4,500 |
$3,950
57,152
kWh
|
$1,050
-
kW-mo/yr
|
$180 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs