| Assessment Year | 1998 |
|---|---|
| Principal Product | vehicle safety lighting |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $50 M to 100M |
| # of Employees | 468 |
| Plant Area |
222,500
ft2
|
| Annual Production | 30,000,000
pieces
|
| Production Hrs. Annual | 4,375
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $183,147 | 4,289,859 |
kWh
|
$0.043 |
| Electricity Demand | $61,866 | 10,628 |
kW-mo/yr
|
$5.82 |
| Natural Gas | $49,819 | 11,095 |
MMBtu
|
$4.49 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $45,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $27,240 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4226: Use / purchase optimum sized compressor | $8,600 | $5,000 |
$6,250
147,128
kWh
|
$2,350
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,940 | $17,360 |
$4,990
117,526
kWh
|
$1,950
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $4,530 | $670 | - | - |
$4,530
-
MMBtu
|
- | - | - | |
| 04 | 2.2136: Install / repair insulation on steam lines | $1,660 | $1,960 |
$1,400
32,825
kWh
|
$260
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,220 | $400 |
$740
17,585
kWh
|
$480
-
kW-mo/yr
|
- | - | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $310 | $420 |
$100
2,345
kWh
|
$20
-
kW-mo/yr
|
- | - | - | $190 | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $16,650 | $5,000 | - | - | - | - |
$16,650
-
lb
|
- | |
| 08 | 3.4111: Use closed cycle process to minimize waste water production | $3,220 | $120 | - | - | - |
$3,220
-
Tgal
|
- | - | |
| 09 | 3.5316: Contract a wood pallet recycling company | $1,440 | - | - | - | - | - |
$1,440
-
lb
|
- | |
| 10 | 3.4116: Meter recycled water (to reduce sewer charges) | $540 | $130 | - | - | - |
$540
-
Tgal
|
- | - | |
| TOTAL RECOMMENDED | $45,110 | $31,060 |
$13,480
317,409
kWh
|
$5,060
-
kW-mo/yr
|
$4,530
-
MMBtu
|
$3,760
-
Tgal
|
$18,090
-
lb
|
$190 | ||
| TOTAL IMPLEMENTED | $27,240 | $25,660 |
$12,740
299,824
kWh
|
$4,580
-
kW-mo/yr
|
$4,530
-
MMBtu
|
$3,760
-
Tgal
|
$1,440
-
lb
|
$190 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs