Assessment Year | 2005 |
---|---|
Principal Product | Animal cough syrup and animal tablets |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
60,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 2,219
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $118,599 | 1,951,720 |
kWh
|
$0.061 |
Electricity Demand | $35,773 | 378 |
kW-mo/yr
|
$94.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,009 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,794 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (haz) Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,914 | $406 |
$1,914
31,893
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,126 | $19,754 |
$7,126
144,283
kWh
|
- | - | |
03 | 2.7233: Use properly designed and sized hvac equipment | $1,567 | $94,000 |
$1,567
80,388
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $572 | $852 |
$572
19,077
kWh
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $754 | - |
$754
4,416
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $809 | $979 |
$809
5,493
kWh
|
- | - | |
07 | 3.5318: Recycle fluorescent lamps | $459 | $3,496 | - |
$459
-
lb
|
- | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,808 | $957 | - | - | $2,808 | |
TOTAL RECOMMENDED | $16,009 | $120,444 |
$12,742
285,550
kWh
|
$459
-
lb
|
$2,808 | ||
TOTAL IMPLEMENTED | $9,794 | $20,160 |
$9,794
180,592
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (haz) Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs