ITAC Assessment: UF0364
ITAC logo
ITAC Assessment: UF0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Animal cough syrup and animal tablets
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 60,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,219
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,599 1,951,720
kWh
Electricity Demand $35,773 378
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,009 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,794

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (haz) Savings Increase in Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,914 $406 $1,914
31,893
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,126 $19,754 $7,126
144,283
kWh
- -
03 2.7233: Use properly designed and sized hvac equipment $1,567 $94,000 $1,567
80,388
kWh
- -
04 2.7135: Install occupancy sensors $572 $852 $572
19,077
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $754 - $754
4,416
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $809 $979 $809
5,493
kWh
- -
07 3.5318: Recycle fluorescent lamps $459 $3,496 - $459
-
lb
-
08 4.111: Add equipment/ operators to reduce production bottleneck $2,808 $957 - - $2,808
TOTAL RECOMMENDED $16,009 $120,444 $12,742
285,550
kWh
$459
-
lb
$2,808
TOTAL IMPLEMENTED $9,794 $20,160 $9,794
180,592
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (haz) Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs