| Assessment Year | 1997 |
|---|---|
| Principal Product | printed products |
| NAICS |
n/a
|
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
232,000
ft2
|
| Annual Production | 22,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $288,374 | 7,592,028 |
kWh
|
$0.038 |
| Electricity Demand | $147,206 | 17,268 |
kW-mo/yr
|
$8.52 |
| Natural Gas | $153,903 | 26,920 |
MMBtu
|
$5.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,600 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,320 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2692: Use outside cold water source as a supply of cooling water | $3,330 | $1,300 |
$2,230
58,617
kWh
|
$1,100
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,820 | $7,770 |
$920
24,033
kWh
|
$900
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $1,420 | $2,000 |
$1,420
37,222
kWh
|
- | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,300 | $80 |
$900
23,740
kWh
|
$400
-
kW-mo/yr
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,200 | $270 |
$830
21,981
kWh
|
$370
-
kW-mo/yr
|
- | |
| 06 | 3.5316: Contract a wood pallet recycling company | $2,530 | - | - | - |
$2,530
-
lb
|
|
| TOTAL RECOMMENDED | $11,600 | $11,420 |
$6,300
165,593
kWh
|
$2,770
-
kW-mo/yr
|
$2,530
-
lb
|
||
| TOTAL IMPLEMENTED | $4,320 | $8,120 |
$2,650
69,754
kWh
|
$1,670
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs