ITAC Assessment: KU0483
ITAC logo
ITAC Assessment: KU0483
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product printed products
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 232,000
ft2
Annual Production 22,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,374 7,592,028
kWh
Electricity Demand $147,206 17,268
kW-mo/yr
Natural Gas $153,903 26,920
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,320

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.2692: Use outside cold water source as a supply of cooling water $3,330 $1,300 $2,230
58,617
kWh
$1,100
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,820 $7,770 $920
24,033
kWh
$900
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,420 $2,000 $1,420
37,222
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,300 $80 $900
23,740
kWh
$400
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $1,200 $270 $830
21,981
kWh
$370
-
kW-mo/yr
-
06 3.5316: Contract a wood pallet recycling company $2,530 - - - $2,530
-
lb
TOTAL RECOMMENDED $11,600 $11,420 $6,300
165,593
kWh
$2,770
-
kW-mo/yr
$2,530
-
lb
TOTAL IMPLEMENTED $4,320 $8,120 $2,650
69,754
kWh
$1,670
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs