ITAC Assessment: AS0136
ITAC logo
ITAC Assessment: AS0136
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Plastic Injection Molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 75,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,767 4,204,279
kWh
Natural Gas $757 99
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,431 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $213 $660 $213
2,638
kWh
02 2.4133: Use most efficient type of electric motors $14,635 $9,240 $14,635
179,074
kWh
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,314 - $1,314
16,120
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,337 $150 $1,337
16,413
kWh
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,720 $7,298 $4,720
57,737
kWh
06 2.7135: Install occupancy sensors $212 $201 $212
2,638
kWh
TOTAL RECOMMENDED $22,431 $17,549 $22,431
274,620
kWh
TOTAL IMPLEMENTED - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs