ITAC Assessment: KU0478
ITAC logo
ITAC Assessment: KU0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product printed products/catalogs
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 109
Plant Area 65,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $26,376 1,133,939
kWh
Electricity Demand $48,924 5,472
kW-mo/yr
Natural Gas $64,827 14,958
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,280 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.2414: Use waste heat from hot flue gases to preheat $15,110 $58,000 - - $15,110
-
MMBtu
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,330 $330 $570
27,843
kWh
$760
-
kW-mo/yr
- - - -
03 2.4323: Use optimum size and capacity equipment $1,130 - $1,130
56,272
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $730 $170 $320
15,826
kWh
$410
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $500 $780 $90
4,396
kWh
$50
-
kW-mo/yr
- - $360 -
06 2.4133: Use most efficient type of electric motors $290 $1,050 $120
6,155
kWh
$170
-
kW-mo/yr
- - - -
07 2.7135: Install occupancy sensors $190 $400 $190
9,672
kWh
- - - - -
08 3.5121: Recycle waste ink and cleanup solvent $3,000 - - - - $1,920
-
lb
- $1,080
TOTAL RECOMMENDED $22,280 $60,730 $2,420
120,164
kWh
$1,390
-
kW-mo/yr
$15,110
-
MMBtu
$1,920
-
lb
$360 $1,080
TOTAL IMPLEMENTED $5,350 $1,550 $1,010
49,824
kWh
$1,340
-
kW-mo/yr
- $1,920
-
lb
- $1,080
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs