Assessment Year | 1997 |
---|---|
Principal Product | yearbooks |
NAICS |
n/a
|
SIC | 2741: Miscellaneous Publishing |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
140,000
ft2
|
Annual Production | 475,000
pieces
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,740 | 1,780,481 |
kWh
|
$0.057 |
Electricity Demand | $25,784 | 4,548 |
kW-mo/yr
|
$5.67 |
Natural Gas | $16,173 | 3,025 |
MMBtu
|
$5.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,150 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $9,820 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,340 | $18,090 |
$3,240
56,858
kWh
|
$1,100
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $2,980 | $1,600 |
$2,980
52,169
kWh
|
- | - | - | - | |
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $640 | $1,000 | - | - |
$640
-
MMBtu
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $590 | $1,450 |
$450
7,913
kWh
|
$140
-
kW-mo/yr
|
- | - | - | |
05 | 2.2437: Recover waste heat from equipment | $580 | $140 | - | - |
$580
-
MMBtu
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $350 | $130 |
$260
4,396
kWh
|
$90
-
kW-mo/yr
|
- | - | - | |
07 | 2.4314: Use synthetic lubricant | $340 | $1,100 |
$200
3,517
kWh
|
$70
-
kW-mo/yr
|
- | - | $70 | |
08 | 3.8132: Use less toxic and volatile solvent substitutes | $1,330 | $1,050 | - | - | - |
$1,500
-
gal
|
$(-170.0) | |
TOTAL RECOMMENDED | $11,150 | $24,560 |
$7,130
124,853
kWh
|
$1,400
-
kW-mo/yr
|
$1,220
-
MMBtu
|
$1,500
-
gal
|
$(-100.0) | ||
TOTAL IMPLEMENTED | $9,820 | $23,510 |
$7,130
124,853
kWh
|
$1,400
-
kW-mo/yr
|
$1,220
-
MMBtu
|
- | $70 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs