ITAC Assessment: IA0193
ITAC logo
ITAC Assessment: IA0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product custom plastic injection molding compounds
NAICS
n/a
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $100
M
to 500
M
# of Employees 350
Plant Area 270,000
ft2
Annual Production 37,200,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,139 12,105,217
kWh
Electricity Demand $18,644 29,808
kW-mo/yr
Natural Gas $68,984 22,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $153,804 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,856 $4,248 $2,678
81,184
kWh
$1,178
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,240 $9,348 $2,621
79,426
kWh
$1,619
-
kW-mo/yr
- - - - -
03 2.7135: Install occupancy sensors $3,418 $399 $3,418
103,751
kWh
- - - - - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,458 $1,000 - - $1,458
-
MMBtu
- - - -
05 2.4221: Install compressor air intakes in coolest locations $587 $1,110 $423
12,896
kWh
$164
-
kW-mo/yr
- - - - -
06 3.7221: Improve process control to prevent spills of material $63,788 $9,315 - - - $788
-
lb
- $63,000 -
07 4.441: Install automatic packing equipment $49,067 $190,000 $(-1,690.0)
(-51,290)
kWh
$(-1,043.0)
-
kW-mo/yr
- - $51,800 - -
08 3.5311: Recover and reuse waste material $27,390 $10,000 - - - - $(-2,880.0) - $30,270
TOTAL RECOMMENDED $153,804 $225,420 $7,450
225,967
kWh
$1,918
-
kW-mo/yr
$1,458
-
MMBtu
$788
-
lb
$48,920 $63,000 $30,270
TOTAL IMPLEMENTED $73,342 $23,911 $5,299
160,610
kWh
$2,797
-
kW-mo/yr
$1,458
-
MMBtu
$788
-
lb
- $63,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs