ITAC Assessment: KU0466
ITAC logo
ITAC Assessment: KU0466
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product tractor enclosures/rollbars
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 95
Plant Area 126,600
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,148 1,101,114
kWh
Electricity Demand $9,407 3,031
kW-mo/yr
Natural Gas $72,586 15,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,409 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,067

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7231: Use radiant heater for spot heating $23,445 $31,940 $10,845
95,545
kWh
- - - - $12,600
02 2.1122: Re-size charging openings or add a movable door on equipment $16,546 $12,960 $(-553.0)
(-15,240)
kWh
$(-276.0)
-
kW-mo/yr
$17,375
-
MMBtu
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $4,661 $6,950 - - $4,661
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,223 $302 $1,992
43,083
kWh
$231
-
kW-mo/yr
- - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,036 $3,500 - - - $2,036
-
gal
- -
06 2.2511: Insulate bare equipment $1,182 $139 $1,182
10,551
kWh
- - - - -
07 2.7135: Install occupancy sensors $731 $700 $615
16,999
kWh
$116
-
kW-mo/yr
- - - -
08 2.4221: Install compressor air intakes in coolest locations $645 $470 $583
12,016
kWh
$62
-
kW-mo/yr
- - - -
09 2.4314: Use synthetic lubricant $418 $105 $357
7,034
kWh
$35
-
kW-mo/yr
- - $26 -
10 2.4133: Use most efficient type of electric motors $387 $688 $356
7,034
kWh
$31
-
kW-mo/yr
- - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $135 $119 $113
3,224
kWh
$22
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $52,409 $57,873 $15,490
180,246
kWh
$221
-
kW-mo/yr
$22,036
-
MMBtu
$2,036
-
gal
$26 $12,600
TOTAL IMPLEMENTED $45,067 $46,953 $14,907
168,230
kWh
$159
-
kW-mo/yr
$17,375
-
MMBtu
- $26 $12,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs