Assessment Year | 1996 |
---|---|
Principal Product | new and rebuilt diesel engines |
NAICS |
n/a
|
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 190 |
Plant Area |
67,000
ft2
|
Annual Production | 5,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,192 | 2,536,049 |
kWh
|
$0.026 |
Electricity Demand | $17,716 | 4,608 |
kW-mo/yr
|
$3.84 |
Natural Gas | $59,840 | 13,046 |
MMBtu
|
$4.59 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,153 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,051 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $24,383 | $3,800 | - | - | - |
$24,383
-
gal
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,482 | $284 |
$1,924
72,685
kWh
|
$558
-
kW-mo/yr
|
- | - | |
03 | 2.7135: Install occupancy sensors | $1,237 | $1,200 |
$875
33,118
kWh
|
$362
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $936 | $2,112 |
$712
26,964
kWh
|
$224
-
kW-mo/yr
|
- | - | |
05 | 2.1133: Adjust burners for efficient operation | $633 | $1,000 | - | - |
$633
-
MMBtu
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $482 | $375 |
$374
14,068
kWh
|
$108
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $30,153 | $8,771 |
$3,885
146,835
kWh
|
$1,252
-
kW-mo/yr
|
$633
-
MMBtu
|
$24,383
-
gal
|
||
TOTAL IMPLEMENTED | $4,051 | $3,396 |
$2,636
99,649
kWh
|
$782
-
kW-mo/yr
|
$633
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs