Assessment Year | 1996 |
---|---|
Principal Product | Trailers |
NAICS |
n/a
|
SIC | 3715: Truck Trailers |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
43,924
ft2
|
Annual Production | 1,350
pieces
|
Production Hrs. Annual | 4,600
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $24,204 | 572,098 |
kWh
|
$0.042 |
Electricity Demand | $17,530 | 2,087 |
kW-mo/yr
|
$8.40 |
Natural Gas | $18,644 | 4,844 |
MMBtu
|
$3.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,960 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $99,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $89,682 | $1,500 | - | - | - | $88,497 | $1,185 | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,630 | $1,000 | - | - |
$4,630
-
MMBtu
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $1,413 | $2,270 |
$858
20,223
kWh
|
$555
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,403 | $4,880 |
$913
21,688
kWh
|
$490
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,146 | $3,783 |
$755
17,878
kWh
|
$391
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $747 | $707 |
$491
11,723
kWh
|
$256
-
kW-mo/yr
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $530 | $250 |
$339
7,913
kWh
|
$191
-
kW-mo/yr
|
- | - | - | |
08 | 2.4314: Use synthetic lubricant | $409 | $270 |
$235
5,569
kWh
|
$122
-
kW-mo/yr
|
- | - | $52 | |
TOTAL RECOMMENDED | $99,960 | $14,660 |
$3,591
84,994
kWh
|
$2,005
-
kW-mo/yr
|
$4,630
-
MMBtu
|
$88,497 | $1,237 | ||
TOTAL IMPLEMENTED | $99,430 | $14,410 |
$3,252
77,081
kWh
|
$1,814
-
kW-mo/yr
|
$4,630
-
MMBtu
|
$88,497 | $1,237 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs