Assessment Year | 1996 |
---|---|
Principal Product | Drilling and Work-Over Oil Rigs |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 0 |
Plant Area |
115,475
ft2
|
Annual Production | 23
pieces
|
Production Hrs. Annual | 6,573
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $116,786 | 2,386,870 |
kWh
|
$0.049 |
Electricity Demand | $34,773 | 4,785 |
kW-mo/yr
|
$7.27 |
Natural Gas | $36,899 | 9,205 |
MMBtu
|
$4.01 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,471 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,954 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $38,846 | $2,500 | - | - | - | $38,846 | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $6,108 | $15,150 |
$6,108
124,853
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,741 | $20,119 |
$4,180
85,580
kWh
|
$1,561
-
kW-mo/yr
|
- | - | |
04 | 2.4133: Use most efficient type of electric motors | $4,386 | $5,807 |
$3,230
66,237
kWh
|
$1,156
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,935 | $375 |
$3,008
61,547
kWh
|
$927
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $1,272 | $850 |
$846
17,292
kWh
|
$426
-
kW-mo/yr
|
- | - | |
07 | 2.8114: Change rate schedules or other changes in utility service | $183 | - | - | - | $183 | - | |
TOTAL RECOMMENDED | $60,471 | $44,801 |
$17,372
355,509
kWh
|
$4,070
-
kW-mo/yr
|
$183 | $38,846 | ||
TOTAL IMPLEMENTED | $44,954 | $17,650 |
$6,108
124,853
kWh
|
- | - | $38,846 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs