ITAC Assessment: KU0460
ITAC logo
ITAC Assessment: KU0460
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Drilling and Work-Over Oil Rigs
NAICS
n/a
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 0
Plant Area 115,475
ft2
Annual Production 23
pieces
Production Hrs. Annual 6,573
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,786 2,386,870
kWh
Electricity Demand $34,773 4,785
kW-mo/yr
Natural Gas $36,899 9,205
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $38,846 $2,500 - - - $38,846
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,108 $15,150 $6,108
124,853
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,741 $20,119 $4,180
85,580
kWh
$1,561
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $4,386 $5,807 $3,230
66,237
kWh
$1,156
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $3,935 $375 $3,008
61,547
kWh
$927
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $1,272 $850 $846
17,292
kWh
$426
-
kW-mo/yr
- -
07 2.8114: Change rate schedules or other changes in utility service $183 - - - $183 -
TOTAL RECOMMENDED $60,471 $44,801 $17,372
355,509
kWh
$4,070
-
kW-mo/yr
$183 $38,846
TOTAL IMPLEMENTED $44,954 $17,650 $6,108
124,853
kWh
- - $38,846
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs