ITAC Assessment: KU0457
ITAC logo
ITAC Assessment: KU0457
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Potato Chips, Snack Foods
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 50,685
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,242 1,327,374
kWh
Electricity Demand $35,287 4,368
kW-mo/yr
Natural Gas $126,739 38,431
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,230 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,949 $26,000 - - $2,549
-
MMBtu
$4,400
-
lb
- $(-1,000.0) -
02 2.1233: Analyze flue gas for proper air/fuel ratio $4,591 $1,000 - - $4,591
-
MMBtu
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,835 $10,180 $711
31,067
kWh
$1,124
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,711 $1,800 $846
37,222
kWh
$865
-
kW-mo/yr
- - - - -
05 2.4133: Use most efficient type of electric motors $1,034 $3,130 $313
13,775
kWh
$721
-
kW-mo/yr
- - - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $813 $155 $755
33,118
kWh
$58
-
kW-mo/yr
- - - - -
07 2.4221: Install compressor air intakes in coolest locations $592 $165 $396
17,292
kWh
$196
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $433 $663 $129
5,569
kWh
$304
-
kW-mo/yr
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $272 $480 $61
2,638
kWh
$29
-
kW-mo/yr
- - $140 - $42
TOTAL RECOMMENDED $17,230 $43,573 $3,211
140,681
kWh
$3,297
-
kW-mo/yr
$7,140
-
MMBtu
$4,400
-
lb
$140 $(-1,000.0) $42
TOTAL IMPLEMENTED $11,281 $17,573 $3,211
140,681
kWh
$3,297
-
kW-mo/yr
$4,591
-
MMBtu
- $140 - $42
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs