ITAC Assessment: AM0243
ITAC logo
ITAC Assessment: AM0243
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Truck shells
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $5
M
to 10
M
# of Employees 23
Plant Area 64,000
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 2,385
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,528 920,281
kWh
Natural Gas $7,832 1,446
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3137: Use power during off-peak periods $12,650 - $12,650
-
kWh
02 2.3137: Use power during off-peak periods $1,770 - $1,770
-
kWh
03 2.4231: Reduce the pressure of compressed air to the minimum required $560 $40 $560
6,155
kWh
04 2.6212: Turn off equipment during breaks, reduce operating time $430 - $430
13,189
kWh
05 2.7134: Use photocell controls $330 $300 $330
4,689
kWh
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $260 $200 $260
8,206
kWh
07 2.4221: Install compressor air intakes in coolest locations $190 $70 $190
2,052
kWh
TOTAL RECOMMENDED $16,190 $610 $16,190
34,291
kWh
TOTAL IMPLEMENTED $13,240 $500 $13,240
12,895
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs