Assessment Year | 1995 |
---|---|
Principal Product | Processing equipment for poultry industry |
NAICS |
n/a
|
SIC | 3556: Food Products Machinery |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
80,100
ft2
|
Annual Production | 525
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $68,196 | 1,091,149 |
kWh
|
$0.062 |
Natural Gas | $16,722 | 3,059 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,816 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,742 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,078 | $33,851 |
$8,171
130,715
kWh
|
- | $1,907 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $132 | $180 |
$64
879
kWh
|
- | $68 | |
03 | 2.7314: Reduce ventilation air | $4,480 | $2,714 | - |
$4,480
-
MMBtu
|
- | |
04 | 2.2136: Install / repair insulation on steam lines | $2,106 | $2,382 | - |
$2,106
-
MMBtu
|
- | |
05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $1,286 | $2,030 | - |
$1,286
-
MMBtu
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $323 | $150 | - |
$323
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $696 | $105 |
$696
11,137
kWh
|
- | - | |
08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $513 | $129 |
$513
8,206
kWh
|
- | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $202 | $60 |
$202
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $19,816 | $41,601 |
$9,646
154,161
kWh
|
$8,195
-
MMBtu
|
$1,975 | ||
TOTAL IMPLEMENTED | $11,742 | $34,415 |
$9,444
150,937
kWh
|
$323
-
MMBtu
|
$1,975 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs