ITAC Assessment: KU0452
ITAC logo
ITAC Assessment: KU0452
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Processing equipment for poultry industry
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 80,100
ft2
Annual Production 525
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $68,196 1,091,149
kWh
Natural Gas $16,722 3,059
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,742

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,078 $33,851 $8,171
130,715
kWh
- $1,907
02 2.7142: Utilize higher efficiency lamps and/or ballasts $132 $180 $64
879
kWh
- $68
03 2.7314: Reduce ventilation air $4,480 $2,714 - $4,480
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $2,106 $2,382 - $2,106
-
MMBtu
-
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $1,286 $2,030 - $1,286
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $323 $150 - $323
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $696 $105 $696
11,137
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $513 $129 $513
8,206
kWh
- -
09 2.4221: Install compressor air intakes in coolest locations $202 $60 $202
3,224
kWh
- -
TOTAL RECOMMENDED $19,816 $41,601 $9,646
154,161
kWh
$8,195
-
MMBtu
$1,975
TOTAL IMPLEMENTED $11,742 $34,415 $9,444
150,937
kWh
$323
-
MMBtu
$1,975
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs