ITAC Assessment: TT0290
ITAC logo
ITAC Assessment: TT0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product swiss rolls and buddy bars
NAICS 311812: Commercial Bakeries
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area 35,000
ft2
Annual Production 46,023,692
lb
Production Hrs. Annual 4,160
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,016 3,404,000
kWh
Electricity Demand $96,153 7,571
kW-mo/yr
Natural Gas $328,858 36,550
MMBtu
Waste Disposal Costs
Water Usage $11,687 3,075
Tgal
Water Disposal $18,963 3,075
Tgal
TOTAL YEARLY COSTS $809,677
RECOMMENDED SAVINGS* $133,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $109,759

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings By-product Production Savings
01 2.4321: Upgrade obsolete equipment $106,623 $200,000 - - $106,623 -
02 4.611: Begin a practice of predictive / preventative maintenance $21,000 $2,000 - - - $21,000
03 2.2437: Recover waste heat from equipment $2,477 $10,500 - $2,477
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,702 $1,755 $1,702
16,366
kWh
- - -
05 2.7224: Reduce space conditioning during non-working hours $911 $30 $911
8,760
kWh
- - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $523 $1,150 $523
5,025
kWh
- - -
TOTAL RECOMMENDED $133,236 $215,435 $3,136
30,151
kWh
$2,477
-
MMBtu
$106,623 $21,000
TOTAL IMPLEMENTED $109,759 $202,935 $3,136
30,151
kWh
- $106,623 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs