ITAC Assessment: KU0443
ITAC logo
ITAC Assessment: KU0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Polyethylene Tanks
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 122,000
ft2
Annual Production 9,000,000
lb
Production Hrs. Annual 6,672
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,073 2,502,345
kWh
Natural Gas $250,538 83,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $104,734 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,751

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $76,353 $131,600 - $76,353
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $5,623 $31,141 $5,623
117,233
kWh
- -
03 2.7145: Install skylights $5,343 $14,940 $5,343
111,372
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,287 $13,432 $5,287
110,199
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,484 $11,400 $5,484
56,858
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $441 $752 $441
4,982
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $465 $299 $465
3,517
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $3,178 $174 $3,178
66,237
kWh
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,645 $150 $1,645
34,291
kWh
- -
10 2.4231: Reduce the pressure of compressed air to the minimum required $759 $180 $759
15,826
kWh
- -
11 2.8112: Combine utility meters $156 $10 - - $156
TOTAL RECOMMENDED $104,734 $204,078 $28,225
520,515
kWh
$76,353
-
MMBtu
$156
TOTAL IMPLEMENTED $17,751 $44,106 $17,595
298,944
kWh
- $156
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs