ITAC Assessment: KU0439
ITAC logo
ITAC Assessment: KU0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product corrugated boxes
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 234,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,181 1,247,655
kWh
Natural Gas $16,744 3,263
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,588 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,097

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7145: Install skylights $4,746 $11,700 $4,746
90,856
kWh
-
02 2.7135: Install occupancy sensors $505 $300 $505
9,672
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $137 $144 $137
879
kWh
-
04 2.4133: Use most efficient type of electric motors $3,139 $7,762 $3,139
60,082
kWh
-
05 2.3212: Optimize plant power factor $2,889 $2,568 $2,889
-
kWh
-
06 2.2437: Recover waste heat from equipment $2,485 $10,260 $(-1,347.0)
(-25,791)
kWh
$3,832
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,608 $120 $1,608
30,774
kWh
-
08 2.4314: Use synthetic lubricant $1,162 $2,890 $1,162
15,240
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $804 $104 $804
15,533
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $260 $100 $260
4,982
kWh
-
11 2.4133: Use most efficient type of electric motors $1,853 $4,220 $1,853
35,463
kWh
-
TOTAL RECOMMENDED $19,588 $40,168 $15,756
237,690
kWh
$3,832
-
MMBtu
TOTAL IMPLEMENTED $12,097 $18,108 $12,097
167,643
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs